Lets start off in this corner |

A cement - backer board is attached to the wall |

Back splash is going to be 15 inches tall |

Next the countertop is covered with cement board |
|

All the joints need to be taped and cemented together |

Back splash tile is put up here |

The center - field tiles are cemented down next |

Then cleaned up a little bit |
|

The front is covered with a bull-nose moulding |

The tile is then grouted |

Under cabinet lights have been installed |

Full size deep sink pushes out 4 inches |
|

This sink isnt installed yet..... |

The Moen Bar sink is plumbed and ready to go |
|
|