Lets start off in this corner


A cement - backer board is attached to the wall


Back splash is going to be 15 inches tall


Next the countertop is covered with cement board


All the joints need to be taped and cemented together


Back splash tile is put up here


The center - field tiles are cemented down next


Then cleaned up a little bit


The front is covered with a bull-nose moulding


The tile is then grouted


Under cabinet lights have been installed


Full size deep sink pushes out 4 inches


This sink isnt installed yet.....


The Moen Bar sink is plumbed and ready to go